    Purified Water System Validation

    Commissioning, qualification, first, second and third phases of validation, their documentation and sampling schedule in purified water system validation.
    Water system validation (generation and distribution) should contain three phases: Phase I: investigation phase; Phase II: short-term control; and Phase III: long-term control.

    The objective of pharmaceutical water system validation during these three phases should demonstrate that water system is under control and producing the specified quality of water over a long time period.

    Commissioning of purified water system

    Water System Qualification
    Proper documentation of commissioning is an essential part of the successful validation of pharmaceutical water system. Commissioning includes the startup of the water system with documenting the performance of all system parameters.

    Qualification

    Purified water, water for pharmaceutical use, water for injection systems can directly affect the quality of our pharmaceutical products. Hence, it should be validated. Before starting the validation, water system qualification should be completed i.e. design qualification (DQ), installation qualification (IQ) and operational qualification (OQ).

    Phase I:

    Water sampling and testing should be done for 2 to 4 weeks to monitor the water system. During this phase, water system should operate continuously without failure. Following things should be considered during this phase.
    •  Sampling and testing of the raw water i.e. feed water should be done to monitor its quality.
    •  Sampling after each step should be done daily.
    •  Chemical and microbiological testing should be done as per the approved specification.
    •  Operating, cleaning, sanitizing and maintenance procedures should be finalized during this phase.
    •  Ensure the production of the required quantity of water.
    •  Alert and action limits should be verified after this phase.

    Related: How to Remove Pathogenic Bacteria from Water System

    Phase II:

    A 2 to 4 week testing should be done again in phase II to monitor the water system intensively. Sampling frequency shall remain as per the previous phase. Water can be used for manufacturing during this phase of water validation.
    The demonstration should be done that the water system is producing the required quality and quantity of water while operated according to the relevant SOP.

    Phase III:

    After the successful completion of phase II, phase III runs for one year. We can use water for manufacturing during this phase.
    •  The frequency of sampling and testing should be reduced in this phase after successful completion of phase I&II.
    •  Seasonal variations are observed in this phase of validation i.e. seasonal trending shall be done.
    Get editable documentsView List

    10 comments: Post Yours! Read Comment Policy ▼

    1. on which time we can conduct the hold time study of water in our water system?? if their is any power failure or any other incidents, how we can conduct the hold time study?? IS it before or after of water system validation?? can you suggest guideline or SOP to handle this operation?

      ReplyDelete
    2. You can hold Time study with in phase lll

      ReplyDelete
    3. Dear Mr.Ankur

      Using RO Water system for Product ,
      Regular check on Physical chemical Parameters & Microbial Load.
      Including Conductivity..... 12 sampling points are monitoring on regular based.
      regular Cleaning Schedule follow with chemical sanitizing agent.
      But conductivity not less then 2.6,
      Specification have IP BP USP with 1.3.

      last five year running RO with each schedule follow, Product is with Zero complaint and product is liquid form but please Suggest me to keep conductivity up to limit. 1.3
      I have to maintain alert and action limit....for conductivity..
      Practically my point is that regular uses and typical RO Not Meet with this 1.3 conductivity Specification,
      so I need your suggestion.
      m last five year working with Five RO Water system and one Ultrafiltration System.

      Best Regards,
      your Sincerely
      Kanan

      ReplyDelete
    4. dear sir i want fully knowledge about water system from installation phase

      ReplyDelete
    5. Before starting phase-I, you should perform Challenging test for Auto dump valves and hold time study. During the phase-I validation drain time study also to be done.

      ReplyDelete
    6. What is the minimum velocity required in return loop of Purified water system as per USP?

      ReplyDelete
    7. Actions to be taken after changing EDI of previously qualified water station?

      ReplyDelete
    8. hii can anyone suggest how we can outsource purifies water and what document we have to prepare for it

      ReplyDelete
    9. hii can anyone suggest how we can outsource purifies water and what document we have to prepare for it

      ReplyDelete
    10. Can any one suggest how to flow rate challenge test for purified water system

      ReplyDelete

    Please don't spam. Comments having links would not be published.


    Popular Categories

    QA SOPs QC SOPs Micro SOPs HVAC Production SOPs Stores SOPs Checklists Maintenance SOPs HPLC Sterile GLP Validation Protocols Water System GDP Regulatory Maintenance Calibration Warning Letters Education B.Pharmacy
    Online Courses


    Follow Pharmaguideline



    DOCUMENTS

    PHARMACEUTICAL DOCUMENTS




    Editable Pharmaceutical Documents in MS-Word Format. Ready to use SOPs, Protocols, Master Plans, Manuals and more...

    View


    adsbypg


    GET APP FOR NEWS UPDATES


    Android App