1.0 OBJECTIVE:
To lay down the cleaning procedure for cad mill.2.0 SCOPE:
This SCP shall be applicable for cad mill used in Granulation area in Production department.3.0 RESPONSIBILITY:
3.1 Execution :Operator3.2 Checking :Pharmacist and Above
4.0 ACCOUNTABILITY:
HOD-Production5.0 PROCEDURE:
5.1 Put “OFF” the electrical supply and cover motor, starter, with polythene bag.5.2 Remove hopper, blade chamber, screen and blades & clean with 25 liter Potable water.
5.3 Further clean with 2.5 % “Teepol” solution using scrubber. Rinse with 25 liter potable water thoroughly.
5.4 Apply 20 liter hot water to all the cleaned items and allow the water to drain. Finally rinse with about 30 liter purified water.
5.5 Wipe out with dry clean lint free cloth and with 70% IPA.
5.6 Assemble the parts and affix "Cleaned" Label and fill “Equipment Log Book” (Annexure-I).
5.7 Re-clean if not used within 72 hours.
6.0 ABBREVIATIONS:
SCP :Standard Cleaning ProcedureIPA :Isopropyl Alcohol
Get ready to use editable documents in MS-Word FormatView List
No comments:
Post a Comment
Please don't spam. Comments having links would not be published.