1.0 Objective
To define the method for programme file checks of software of instruments.2.0 Scope
This procedure is applicable to software related instruments, installed in the quality control department.3.0 Responsibility
3.1 Doing: Technical Assistant/Executive3.2 Checking: Executive /Assistant Manager
4.0 Accountability
Head of the Department5.0 Procedure
Frequency: Every two month5.1 Switch ‘ON’ the mains.
5.2 Switch ‘ON’ the instruments.
5.3 Refer respective manual of instruments.
5.4 Follow all the instruction before taking any programme file of any instruments.
5.5 Perform programme file checks.
5.6 Take the print out and maintain the record as per Annexure-I.
5.7 In case any file found not O.K follow S.O.P.
6.0 Abbreviations
6.1 SOP - Standard Operating Procedure
Related: SOP for Backup/Restore Analytical Data in Electronic Form
ANNEXURE-I
QUALITY CONTROL LABORATORY
PROGRAMME FILE CHECKS FOR PERFORMANCE OF SOFTWARE
PERFORMANCE DATE
|
DATE OF LAST PERFORMANCE DONE
|
NEXT DUE FOR
PERFORMANCE
|
INSTRUMENT DETAILS
| ||
INSTRUMENT NAME
| INSTRUMENT MAKE |
INSTRUMENT
IDENTIFICATION NO.
|
OBSERVATION
|
1) All programme files ____________________ ( OK/ Not OK)
[Acceptance criteria :- All files should be OK]
CONCLUSION
INSTRUMENT WORKING SATISFACTORY
INSTRUMENT NOT WORKING SATISFACTORY
PERFOMED BY
CHECKED BY
NAME
SIGN.
DATE
NAME
SIGN.
DATE
CONCLUSION
INSTRUMENT WORKING SATISFACTORY
INSTRUMENT NOT WORKING SATISFACTORY
PERFOMED BY
|
CHECKED BY
|
||||
NAME
|
SIGN.
|
DATE
|
NAME
|
SIGN.
|
DATE
|
Get ready to use editable documents in MS-Word FormatView List
No comments:
Post a Comment
Please don't spam. Comments having links would not be published.