1.0 OBJECTIVE
To clearly lay down the procedure for cleaning.2.0 SCOPE
This procedure is applicable for Puncture resistance tester, Installed in quality control laboratory.3.0 RESPONSIBILITY
3.1 Doing: Technical Assistant/Executive3.2 Checking: Executive/Manager
4.0 ACCOUNTABILITY
Head of the Department5.0 PROCEDURE
5.1 After completion of the testing, remove the samples from the instrument.5.2 Remove the plastic flap from the top side of the instrument and clean with a cotton cloth.
5.3 Remove the weight and clean the outer surface and remaining part of the instrument with a cotton cloth
5.4 Record it in instrument log card.
5.5 Frequency: Daily
Note: Take care that instrument setting of the scale does not disturb.
Related: SOP for Operation and Calibration Leak Test Apparatus
6.0 ABBREVIATION
6.1 SOP - Standard Operating Procedure