1.0 OBJECTIVE
To lay down the procedure for operation of the conveyor belt in the packing department.2.0 SCOPE
This SOP shall be applicable for operation of the conveyor belt in the packing department.3.0 RESPONSIBILITY
3.1 Execution: Operator3.2 Checking: Production Pharmacist & Above
4.0 ACCOUNTABILITY
HOD-Production/ Assigned Designee5.0 PROCEDURE
5.1 Affix the status label of Product Name, Batch Details with date and signature of a pharmacist, after ensuring the cleaning of line & entering the same activity in the Equipment log book.5.2 Ensure that the line clearance has been certified by Q.A.
5.3 Connect the mains to the supply point.
5.4 Put On the main switch.
5.5 Start the conveyor belt by pushing the green button on the panel.
5.6 Take the packaging material of the batch besides the belt.
5.7 Start the packing activity, as specified in BPR.
5.8 Stop the conveyor belt by pushing the red button on the panel after completion of the activity or as and when required.
5.9 Records the details such as product name. Batch no. and time of packaging activity in the Equipment log book.
6.0 ABBREVIATIONS
6.1 SOP: Standard Operating Procedure6.2 Q.A.: Quality Assurance
6.3 HOD: Head of The Department
Get ready to use editable documents in MS-Word FormatView List
No comments:
Post a Comment
Please don't spam. Comments having links would not be published.