1.0 OBJECTIVE
To lay down the procedure for Operation of Multimill.2.0 SCOPE
This SOP shall be applicable for Multimill in all Granulation area at Production department.3.0 RESPONSIBILITY
3.1 Execution: Operator3.2 Checking: Production Pharmacist & Above
4.0 ACCOUNTABILITY
HOD-Production / Assigned Designee5.0 PROCEDURE
5.1 Production person shall ensure the cleanliness of the machine & area and ‘CLEANED’ label on it.5.2 Check the integrity of screen before and after the operation and record the observation in “Screen integrity check Log”.
5.3 Before starting the operation production person get the line clearance from QA person and affix the status label with Product Name, batch details to equipment & area.
5.4 Fix the beater assembly.
5.5 Fit the screen of the required size and the hopper properly.
5.6 Set the Multimill in the required direction (Knife forward / Impact forward) by moving the lever/ knob. Then adjust the required speed by changing the position of V- belt.
5.7 Tie the poly bag to the discharge chute of Multimill by food grade rubber & keep the poly bag in S.S. In process container and then place a container below the discharge port.
5.8 Put “ON” the mains, then press the green button and load the material, adjust the chute plate so that material will feed slowly and checks for the smooth functioning of the machine.
5.9 Control the flow with stopper plate & ensure that the hopper is not charged heavily otherwise the Multimill can get blocked.
5.10 Put “OFF” the mains after completion of the operation.
5.11 Affix “To Be Cleaned” label on Multimill & fill the “Equipment Log Book”.
6.0 ABBREVIATIONS
6.1 SOP: Standard Operating Procedure6.2 HOD: Head of The Department
6.3 S.S.: Stainless Steel
Get ready to use editable documents in MS-Word FormatView List
No comments:
Post a Comment
Please don't spam. Comments having links would not be published.