1.0 OBJECTIVE
To lay down the procedure for cleaning of Quality Control Dept. throughout working.2.0 SCOPE
This SOP shall be applicable to Quality Control Dept.3.0 RESPONSIBILITY
Supervisor Quality Control4.0 ACCOUNTABILITY
Sr. Manager Quality Assurance5.0 PROCEDURE
5.1 Mop the floor with 3 % v/v Dettol solution in the morning and evening, of the Chemical Section, Instrument Rooms, Chemical Storage Room, Control Sample Room and Stability Sample Room.5.2 Clean the walls and ceiling with a long broom on weekly basis.
5.3 Clean the glasses of doors and windows with glass cleaning powder on weekly basis.
5.4 Dedust the reagents racks and the working table every day.
5.5 Clean the dustbins and basins once a week.
5.6 Clean the fans and fixtures in the first week of every month.
5.7 Clean all the Instruments daily with a muslin cloth.
5.8 Document all cleaning operation in the prescribed format.
Related: SOP for Cleaning of Quality Control Laboratory
6.0 ABBREVIATIONS
6.1 SOP: Standard Operating Procedure6.2 QA: Quality Assurance
6.3 QC: Quality Control
6.4 Dept.: Department
Get ready to use editable documents in MS-Word FormatView List
No comments:
Post a Comment
Please don't spam. Comments having links would not be published.