1.0 OBJECTIVE
To lay down the procedure for temperature mapping.2.0 SCOPE
This SOP shall be applicable for walk-in coolers, biological incubators, refrigerator and freezer.3.0 RESPONSIBILITY
Officer/ Executive/ Assistant Manager4.0 ACCOUNTABILITY
HOD of Engineering and QA5.0 PROCEDURE
5.1 Temperature mapping is to be carried out by using the calibrated temperature probes and data logger.5.2 Identify positions & number of locations for temperature mapping such that, it covers every corner & center of the chamber.
5.3 Prepare a protocol for temperature mapping indicating objective, scope, responsibilities, methodology, acceptance criteria, calibration status, summary and conclusion.
5.4 Protocol to be prepared by officer/ executive of concerned department, checked by the head of concerned department and shall be approved by head QA/QC.
5.5 Place temperature probes at the identified locations without touching the tip to any surface inside the chamber.
5.6 Select the number of channels and set the print interval of 30 minutes on the data logger.
5.7 Start the mapping after stabilization of the displayed temperature.
5.8 Record the temperature readings of each probe in temperature mapping record.
5.9 If results do not fall within the specified limit, take necessary corrective actions to rectify the failure & perform the mapping again.
5.10 Final report for temperature mapping to be prepared by officer/ executive of the concerned department based on results obtained indicating the summary and conclusion.
5.11 Report shall be checked by the head of concerned department and shall be approved by head QA/QC.
5.12 After approval of the report daily monitoring shall be done at the identified hot spot.
5.13 For new equipment, the mapping is to be done for three consecutive days.
5.14 Remapping to be done for equipment once in the year for 24 hours.
5.15 Acceptance Criteria
Temperature shown by individual temperature probe should not be more than 25±2°C.6.0 ABBREVIATIONS
6.1 SOP: Standard Operating Procedure6.2 QA: Quality Assurance
6.3 QC: Quality Control
Get ready to use editable documents in MS-Word FormatView List
Superb !!!!
ReplyDeleteIs there a Guide that defines the frequency of Ra-mapping ?
ReplyDeleteHi the BS EN 17141 provide the guide for frequency of re-mapping
ReplyDelete