1.0 OBJECTIVE
To lay down the procedure for operation of forced draft ventilation (FDV) & forced exhaust (FE) unit.2.0 SCOPE
This SOP shall be applicable for all forced draft ventilation & forced exhaust unit in case of failure in BMS system.3.0 RESPONSIBILITY
Technician/ Engineer/ Executive4.0 ACCOUNTABILITY
HOD Engineering5.0 PROCEDURE
5.1 For starting forced draft ventilation & forced exhaust units5.1.1 Keep the selector switch at "HAND" position on the feeder.
5.1.2 Ensure emergency switch on the feeder is in the released condition.
5.1.3 Start forced draft ventilation & forced exhaust unit by pressing red "ON" push button on the feeder.
5.2 For stopping forced draft ventilation & forced exhaust units
5.2.1 Stop Forced Draft Ventilation & Forced Exhaust Unit by turning the selector switch to center position.
5.3 Maintain the record of FDV/FE unit ON and OFF time in the daily record for forced draft ventilation & forced exhaust unit.
6.0 ABBREVIATION
6.1 SOP: Standard Operating Procedure